Las Mesas Collection – Modern 2-bedroom groundfloor apartment in Estepona
Welcome to Las Mesas Collection – a brand new development of 41 apartments offering 2, 3 and 4 bedrooms arranged over four blocks. Blocks 1 and 2 have 20 homes in total, 11 homes in Block 1, and 9 homes in Block 2. The Blocks 3 and 4 have 21 homes in total, 12 homes in Block 3 and 9 homes in Block 4. Each of the homes have garage space and a storage room.
The contemporary architecture and design, generous terraces make the most of the views and natural sunlight. The development is located in a highly sought after area with all services within walking distance, including the Estepona marina.
The complex offers a spectacular swimming pool, a fully equipped gym and wellness centre located in the basement areas of blocks 1 and 2.
The 2 and 3 bedroom apartments have direct access to the terrace from the bedrooms and living areas. They are designed to maximize space and natural light, creating spacious and bright environment. The open-concept living areas integrate seamlessly with the open plan kitchen, which is fully equipped with high-end fixtures and finishes.
The 4-bedroom duplex penthouses have rooftop solariums. It has photovoltaic panels that contribute to greater energy efficiency, positioning this complex as a model of sustainable living.
Each apartment features luxurious details, the master bedrooms have en-suite bathroom. In addition, the expansive terraces offer breathtaking sea views, allowing you to enjoy the Mediterranean climate all year round.
Landscaped gardens with native plants, automatic irrigation, and LED lights create a tranquil and sustainable environment. The saltwater pool, surrounded by lounging areas, and a fully equipped fitness center, along with the SPA, provide options for leisure and wellness. Security is a priority with a video intercom and surveillance system.
The development stands out for its impressive outdoor facilities and top-notch amenities, designed to enhance quality of life and foster community.
Construction started: 2024
Estimated Completion: Q3 2026